Connected systems
DC Charging Infrastructure
DC BusWay, PCS, SST, Protection — the DC backbone for CCS, MCS, and V2X charging (ISO 15118-2/20).
On the bus
Why dc charging infrastructure belongs on the DC BUS
High-power DC charging belongs on a DC spine when depots and fleets must scale without multi-year grid upgrades.
Integration points
- DC chargers on 800V distribution intent
- BESS buffer for peak charge windows
- OCPP 2.0.1/2.1 metering and ISO 15118-20 V2X control (design target)
- Export and import limits enforced at PCS / EMS layer
Architecture
Where it sits in the energy graph
Products
Platform building blocks

Design target
800V DC BusWay
The physical backbone. Plug-in DC distribution.
Details →
Design target
Power Conversion System
Bidirectional AC ↔ DC conversion. Grid-forming capable.
Details →
Design target
DC Protection
Native DC arc detection. Not adapted AC switchgear.
Details →
Design target
DC Meter
IEEE 2030.5-native measurement on the DC bus.
Details →Solutions
Buyer paths that use this system
Fleet Charging
BESS + 800V DC BUS. All DC output voltages. Dynamic load management. V2G.
Learn more →P1Commercial Buildings
Rooftop PV, battery, AC charging, grid-interactive, BTM energy.
Learn more →P0Grid Capacity
BESS + PCS + EMS orchestration to unlock capacity behind constrained grid connections.
Learn more →Integrating dc charging infrastructure into your DC architecture?
Talk with Joule Junction about platform fit and open standards.