
Connected systems
Storage
BESS 50 kW – 5 MW, LFP, Na+, BMS. Modular architecture to utility-scale deployments.
On the bus
Why storage belongs on the DC BUS
Storage on a shared DC bus can buffer grid limits, peak loads, and solar without a unique conversion stack for every use case.
Integration points
- DC-coupled or bus-adjacent BESS packages (design target)
- PCS orchestration for charge/discharge and export limits
- Metering at storage boundary for EMS and utility visibility
- Protection coordinated with trunk and tap-offs
Architecture
Where it sits in the energy graph
Products
Platform building blocks

Design target
Power Conversion System
Bidirectional AC ↔ DC conversion. Grid-forming capable.
Details →
Design target
800V DC BusWay
The physical backbone. Plug-in DC distribution.
Details →
Design target
DC Meter
IEEE 2030.5-native measurement on the DC bus.
Details →
Design target
DC Protection
Native DC arc detection. Not adapted AC switchgear.
Details →Solutions
Buyer paths that use this system
Grid Capacity
BESS + PCS + EMS orchestration to unlock capacity behind constrained grid connections.
Learn more →P0Fleet Charging
BESS + 800V DC BUS. All DC output voltages. Dynamic load management. V2G.
Learn more →P1Commercial Buildings
Rooftop PV, battery, AC charging, grid-interactive, BTM energy.
Learn more →P3Remote & Off-Grid
Islandable microgrids, solar + storage + PCS + orchestration.
Learn more →Integrating storage into your DC architecture?
Talk with Joule Junction about platform fit and open standards.