
Industry
Logistics & Fleets
Depot and logistics electrification — BESS-buffered DC charging without multi-year grid upgrades.
The problem
Why this vertical cares
Fleet electrification forces expensive connection upgrades and long queues; unmanaged charging peaks punish demand charges.
Primary buyer: Fleet operator / logistics·Typical capacity: 500 kW–2 MW
Solutions
Related buyer paths
P0
Fleet Charging
BESS + 800V DC BUS. All DC output voltages. Dynamic load management. V2G.
Learn more →P0Grid Capacity
BESS + PCS + EMS orchestration to unlock capacity behind constrained grid connections.
Learn more →P1Commercial Buildings
Rooftop PV, battery, AC charging, grid-interactive, BTM energy.
Learn more →Platform
Layers to explore
Evaluating open DC architecture for logistics & fleets?
Bring site constraints and growth plans — we map them to the energy-flow graph.