AI Data Centres at Joule Junction — solution context

Solution · P2

AI Data Centres

Modular power and cooling containers paired with BESS — 20 ft shipping-container GPU + cooling on the DC BUS.

5–50 MW
Typical capacity
Data centre operator / colo / GPU cloud
Primary buyer
P2
Priority tier
Projected / Targeting
Outcome confidence

The problem

Why this matters

Buyer pain first — architecture second. If the problem is not real, the stack is irrelevant.

MW-scale GPU racks outrun legacy AC/low-VDC power distribution. Cooling and power density are the bottleneck.

Buyer jobs

  • · Deploy dense power + cooling modules faster than traditional fit-out
  • · Pair GPU containers with BESS on a shared DC architecture
01

MW-scale GPU racks outrun legacy AC/low-VDC power distribution.

02

Cooling and power density are the bottleneck.

Architecture notes

  • · 20 ft containerised GPU + cooling modules on the DC BUS (design target)
  • · BESS buffering for power density and grid constraint management

Architecture

How Joule Junction addresses it

Deployment scale 5–50 MW. The solution traverses these energy-flow stages on the open DC platform.

Energy-flow path

  1. 01Grid InteractionGrid-forming, grid-following, export limiting, Volt/VAR, frequency response, black start.
  2. 02ConversionAC ↔ DC conversion, voltage transformation — PCS, SST, rectifiers, inverters.
  3. 03DistributionDC power distribution — busway, cabling, termination, tap-off units.
  4. 04ProtectionDC arc protection, digital relays, circuit protection, isolation.
  5. 05LoadsEnergy consumption — EV charging, HVAC, motors, data centres, buildings, processes.
  6. 06ControlEnergy management, dispatch optimisation, forecasting, VPP participation.
  7. 07MeteringMeasurement at every point — grid edge, DC bus, load, charger. IEEE 2030.5-native.

Commercial outcome

What you are targeting

Outcomes below are design-target projections unless marked measured or customer-reported.

Projected / Targeting

Modular power + cooling containers paired with BESS on a shared DC bus (design target).

Evaluating ai data centres for your project?

Talk with Joule Junction about site capacity, load profile, and architecture fit — platform first, products second.