
Solution · P1
Utilities
DER aggregation, VPP, grid-edge services, IEEE 2030.5-native.
- 500 kW–10 MW
- Typical capacity
- Utility / DNSP / aggregator
- Primary buyer
- P1
- Priority tier
- Projected / Targeting
- Outcome confidence
The problem
Why this matters
Buyer pain first — architecture second. If the problem is not real, the stack is irrelevant.
Utilities need standardised DER integration without proprietary lock-in.
Buyer jobs
- · Integrate DER with standardised profiles
- · Enable VPP / aggregation paths without proprietary lock-in
Utilities need standardised DER integration without proprietary lock-in.
Architecture notes
- · IEEE 2030.5-native metering and control intent
- · Open architecture over single-vendor DER stacks
Architecture
How Joule Junction addresses it
Deployment scale 500 kW–10 MW. The solution traverses these energy-flow stages on the open DC platform.
Energy-flow path
Platform
Three layers. One stack.
Every solution runs on DC BUS, Metering, and Energy Management — the same open architecture at every scale.

DC BUS
The physical DC backbone. SST, BusWay, PCS, protection, and grid interface in one architecture — current flagship 800 V DC.
- Solid State Transformer (SST)
- DC BusWay
- Power Conversion System (PCS)

Metering
IEEE 2030.5-native data layer. Measurement at every point — grid edge, DC bus, load, charger.
- IEEE 2030.5 Smart Meters
- DC Energy Meters
- Sensors & Data Acquisition

Energy Management
Software that optimizes. The layer customers evaluate first.
- Forecasting
- Tariff optimisation
- Battery optimisation
Connected systems
What integrates on the bus
Systems designed to sit on the DC BUS for this solution.
Products
Platform building blocks
Hardware that shares energy-flow stages with this solution.
Commercial outcome
What you are targeting
Outcomes below are design-target projections unless marked measured or customer-reported.
Projected / Targeting
DER aggregation revenue via VPP participation.
More solutions
Related buyer paths
Grid Capacity
BESS + PCS + EMS orchestration to unlock capacity behind constrained grid connections.
Learn more →P0Fleet Charging
BESS + 800V DC BUS. All DC output voltages. Dynamic load management. V2G.
Learn more →P0Edge Data Centres
Compact 800V DC architecture for distributed edge deployments.
Learn more →Evaluating utilities for your project?
Talk with Joule Junction about site capacity, load profile, and architecture fit — platform first, products second.

